SOUTH BANK ROAD over CHEHALIS RIVER OVERFLOW

1.4 SW JCT SR 12 · County 027, Washington · Built 2013 · 2 Lanes · 1,110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
088571000000000
Year Built
2013
Length
77.1 m (253 ft)
Max Span
25.4 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,110
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,747,000
Total Project Cost
$9,494,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.