SOUTH BANK ROAD over DAVIS CREEK
0.4 N GARRARD CREEK RD · County 027, Washington · Built 2011 · 2 Lanes · 807 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
46.834167, -123.264167
This bridge is in worse condition than 11.3% of bridges in County 027. The average bridge in Washington is 0 years old; this one is 15 years old.
Nearby Bridges
SOUTH BANK ROAD over CHEHALIS RIVER
Built 1930
SOUTH BANK ROAD over CHEHALIS RIVER OVERFLOW
Built 2013
US 12 over RAILROAD
Built 1932
SOUTH BANK ROAD over HARRIS CREEK
Built 2012
MATTSON ROAD over GARRARD CREEK
Built 2016
HARP ROAD over GARRARD CREEK
Built 2008
ELMA GATE ROAD E over HARRIS CREEK
Built 1917
FORREST ROAD over GARRARD CREEK
Built 2009
WILLIAMS CREEK RD over WILLIAMS CREEK
Built 1973
80490 over BLACK RIVER
Built 1984
Bridge Details
- Structure #
- 088340000000000
- Year Built
- 2011
- Length
- 12.5 m (41 ft)
- Max Span
- 12.5 m
- Lanes
- 2
- Daily Traffic
- 807
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $920,000
- Total Project Cost
- $1,841,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.