KLICKITAT DRIVE over SB SOUTHCENTER PKWY

AT SOUTHCENTER PARKWAY · County 033, Washington · Built 2012 · 3 Lanes · 14,024 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
088536000000000
Year Built
2012
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
30.5 m (100.1 ft)
Lanes
3
Daily Traffic
14,024
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$206,000
Total Project Cost
$412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.