SAUK PRAIRIE RD over SAUK RIVER

0.7 NE JCT SR 530 · County 061, Washington · Built 2008 · 2 Lanes · 801 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088041000000000
Year Built
2008
Length
143.9 m (472.1 ft)
Max Span
80 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
801
Material
Steel Continuous
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$8,700,000
Total Project Cost
$17,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.