SR 530 over SQUIRE CREEK
24.2 E JCT SR 9 · County 061, Washington · Built 1972 · 2 Lanes · 3,349 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
48.270364, -121.67145
This bridge is in worse condition than 50.6% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 54 years old.
Nearby Bridges
SR 530 over ASHTON CREEK
Built 1970
SR 530 over FIRLAND CREEK
Built 1970
SWEDE HEAVEN RD over TRIB.N.F.STILLAGUAMISH R
Built 1985
SWEDE HEAVEN RD over N.F.STILLAGUAMISH RIVER
Built 1991
SWEDE HEAVEN RD over BLACK CREEK
Built 2002
SWEDE HEAVEN RD over SEGELSON CREEK
Built 1981
365 TH DR NE over TRIB.N.F.STILLAGUAMISH
Built 1992
ROAD over SWEDE CREEK
Built 1982
SAUK PRAIRIE RD over SAUK RIVER
Built 2008
SR 530 over FRENCH CREEK
Built 1982
Bridge Details
- Structure #
- 0009423A0000000
- Year Built
- 1972
- Length
- 34.4 m (112.9 ft)
- Max Span
- 32.9 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,349
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,127,000
- Total Project Cost
- $2,254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.