CROWN CAMP ROAD over DUCK CREEK

MP 0.57 CROWN CAMP RD. · County 069, Washington · Built 2007 · 2 Lanes · 63 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
087704000000000
Year Built
2007
Length
16.8 m (55.1 ft)
Max Span
16.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
63
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$470,000
Total Project Cost
$940,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.