SR 409 over COLUMBIA R PUGET ISLAND
2.8 N FERRY DOCK · County 069, Washington · Built 1938 · 2 Lanes · 1,973 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.197842, -123.382269
This bridge is in worse condition than 54.1% of bridges in County 069. The average bridge in Washington is 0 years old; this one is 88 years old.
Nearby Bridges
SR 409 over BIRNIE SLOUGH
Built 1947
SR 409 over GARDEN SLOUGH
Built 1982
SR 4 over TIDE GATE CULVERT
Built 2015
ELOCHOMAN VLY RD over ELOCHOMAN RIVER
Built 1963
FOSTER ROAD over ELOCHOMAN RIVER
Built 1977
SR 4 over ELOCHOMAN RIVER
Built 1955
Risk Rd. over Nelson Creek
Built 2022
FERRY RAMP over COLUMBIA R/SR 409
Built 2010
BEAVER CREEK ROAD over ELOCHOMAN RIVER
Built 1963
HWY 2W CONN over US 30 (HWY 92)
Built 1967
Bridge Details
- Structure #
- 0002377A0000000
- Year Built
- 1938
- Reconstructed
- 1987
- Length
- 797.1 m (2615.2 ft)
- Max Span
- 128 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,973
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,148,000
- Total Project Cost
- $32,295,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.