RIVERSIDE DRIVE over HOAG & STEWARD ST

RIVERSIDE DR JCT HOAG ST · County 057, Washington · Built 2003 · 4 Lanes · 21,640 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
087593000000000
Year Built
2003
Length
18.3 m (60 ft)
Max Span
18.1 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
21,640
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$972,000
Total Project Cost
$1,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.