I-5 over SR 538

1.3 N JCT SR 536 · County 057, Washington · Built 1955 · 4 Lanes · 32,095 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

48.435875, -122.340997

This bridge is in worse condition than 39.8% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 71 years old.

Nearby Bridges

Bridge Details

Structure #
0004795A0000000
Year Built
1955
Reconstructed
1974
Length
37.8 m (124 ft)
Max Span
16.8 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
32,095
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,444,000
Total Project Cost
$4,889,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.