BASS AVENUE over BASS AVE CANAL

0.3 E POINT BROWN AVE · County 027, Washington · Built 2005 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
087516000000000
Year Built
2005
Length
24.4 m (80.1 ft)
Max Span
23 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,624,000
Total Project Cost
$3,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.