MT OLYMPUS AVE over CANAL
0.1 N DISCOVERY · County 027, Washington · Built 1969 · 2 Lanes · 412 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.952472, -124.135078
This bridge is in worse condition than 79.8% of bridges in County 027. The average bridge in Washington is 0 years old; this one is 57 years old.
Nearby Bridges
TONQUIN AVE over LAKE MINARD
Built 2011
POINT BROWN AVE over CANAL
Built 2003
S RAZOR CLAM DR SW over LAKE MINARD CANAL
Built 2018
BASS AVENUE over BASS AVE CANAL
Built 2005
OCEAN LAKE WAY over GRAND CANAL
Built 2005
OVERLAKE ST over DUCK LAKE
Built 1970
ALBATROSS STREET over DUCK LAKE
Built 1970
SR 105 over SOUTH BAY
Built 1955
SR 109 over GRASS CREEK
Built 1956
SR 109 over CONNER CREEK
Built 1955
Bridge Details
- Structure #
- 085394000000000
- Year Built
- 1969
- Length
- 40.2 m (131.9 ft)
- Max Span
- 9.8 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 412
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $784,000
- Total Project Cost
- $1,568,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.