PROVIDENCE RD over EAST LOW CANAL
02.00 MI E SR17 · County 001, Washington · Built 2004 · 2 Lanes · 10 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.911892, -119.094167
This bridge is in worse condition than 4.3% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 22 years old.
Nearby Bridges
11 RD SE over EAST LOW CANAL
Built 1952
PROVIDENCE RD over ECBID WASTEWAY
Built 1995
STEELE RD over BRANCH CANAL EL68 134+51
Built 1952
HERMAN RD over EAST LOW CANAL
Built 1953
FARM ACCESS over East Low 68 Mile Lateral
Built 1953
U ROAD SE over S. WARDEN COULEE
Built 1960
HERMAN RD over BRANCH CANAL EL68
Built 1952
REYNOLDS RD over EL68 WASTEWAY CANAL
Built 1952
BOOKER RD over EAST LOW CANAL
Built 1971
S RD SE over IRRIGATION LATERAL
Built 1952
Bridge Details
- Structure #
- 087225000000000
- Year Built
- 2004
- Length
- 27.4 m (89.9 ft)
- Max Span
- 27.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,805,000
- Total Project Cost
- $3,610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.