HERMAN RD over EAST LOW CANAL
03.17 MI E SR17 · County 001, Washington · Built 1953 · 2 Lanes · 272 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.882736, -119.066539
This bridge is in worse condition than 73.8% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 73 years old.
Nearby Bridges
BOOKER RD over EAST LOW CANAL
Built 1971
STEELE RD over BRANCH CANAL EL68 134+51
Built 1952
FOLEY RD over EAST LOW CANAL
Built 1953
PROVIDENCE RD over EAST LOW CANAL
Built 2004
FARM ACCESS over East Low 68 Mile Lateral
Built 1953
11 RD SE over EAST LOW CANAL
Built 1952
U ROAD SE over S. WARDEN COULEE
Built 1960
HERMAN RD over BRANCH CANAL EL68
Built 1952
SUTTON ROAD over BRANCH CANAL EL68 275+19
Built 1952
LEE RD over WASTEWAY EL68 STA 264+67
Built 1986
Bridge Details
- Structure #
- 080990000000000
- Year Built
- 1953
- Reconstructed
- 1971
- Length
- 23.2 m (76.1 ft)
- Max Span
- 7.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 272
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,552,000
- Total Project Cost
- $3,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.