NISQUALLY RD SW over BNSF RAILROAD OVERPASS
1.1 S JCT SR 5 · County 053, Washington · Built 2004 · 3 Lanes · 13,225 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.072458, -122.694306
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 22 years old.
Nearby Bridges
I-5 over NISQUALLY OVERFLOW
Built 1983
I-5 over NISQUALLY RIVER
Built 1937
I-5 over NISQUALLY OVERFLOW
Built 1968
I-5 over NISQUALLY RIVER
Built 1967
I-5 over NISQUALLY OVERFLOW-SOUTH
Built 1982
I-5 over NISQUALLY OVERFLOW
Built 1968
OLD PACIFIC HWY over NISQUALLY RIVER
Built 1998
NISQUALLY CUTOFF over OVERFLOW CHANNEL
Built 1936
I-5 S-E RAMP over I-5 MAINLINE
Built 1968
MOUNTS RD TO I-5 over BNRR
Built 1960
Bridge Details
- Structure #
- 087173000000000
- Year Built
- 2004
- Length
- 195.7 m (642.1 ft)
- Max Span
- 58.5 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 3
- Daily Traffic
- 13,225
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,040,000
- Total Project Cost
- $26,080,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.