I-5 over NISQUALLY OVERFLOW

0.6 N THURSTON CO · County 053, Washington · Built 1983 · 3 Lanes · 62,815 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012137B0000000
Year Built
1983
Length
121.9 m (399.9 ft)
Max Span
30.5 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
62,815
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,130,000
Total Project Cost
$10,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.