O-SW over WEST LOW CANAL
O SW .06 N of Frenchmen · County 025, Washington · Built 1997 · 2 Lanes · 155 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.001386, -119.814042
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 29 years old.
Nearby Bridges
GEORGE SOUTH ROAD over WEST CANAL BLK 78
Built 1993
M RD SW over IRRIGATION LATERAL
Built 1958
ADAMS ROAD over WEST CANAL BLK 78
Built 1994
FRENCHMAN HILLS RD over WEST CANAL
Built 1987
O RD SW over WEST CANAL
Built 1958
K SW S of 7 SW over WEST CANAL
Built 1951
M RD SW over WEST CANAL
Built 1958
L ROAD SW over LAT. W61C BLK 81
Built 1964
Q SW over WEST CANAL BLK 78
Built 1993
L ROAD SW over LAT. RB4 BLK 82
Built 1990
Bridge Details
- Structure #
- 086537000000000
- Year Built
- 1997
- Length
- 28 m (91.9 ft)
- Max Span
- 27.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 155
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,841,000
- Total Project Cost
- $3,682,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.