GEORGE SOUTH ROAD over WEST CANAL BLK 78

Q SW 1.3 South of 3 · County 025, Washington · Built 1993 · 2 Lanes · 831 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

47.027222, -119.855811

This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 33 years old.

Nearby Bridges

Bridge Details

Structure #
086061000000000
Year Built
1993
Length
28.3 m (92.8 ft)
Max Span
28 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
831
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$795,000
Total Project Cost
$1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.