GEORGE SOUTH ROAD over WEST CANAL BLK 78
Q SW 1.3 South of 3 · County 025, Washington · Built 1993 · 2 Lanes · 831 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.027222, -119.855811
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 33 years old.
Nearby Bridges
Q SW over WEST CANAL BLK 78
Built 1993
O-SW over WEST LOW CANAL
Built 1997
BEVERLY BURKE RD over I-90
Built 1964
SR 281 over I-90
Built 1964
SR 281 over WEST CANAL
Built 1964
SO. FRONTAGE RD. over WEST CANAL
Built 1950
I-90 over WEST CANAL
Built 1964
I-90 over WEST CANAL
Built 1964
I-90 over SILICA RD
Built 1981
I-90 over SILICA RD
Built 1982
Bridge Details
- Structure #
- 086061000000000
- Year Built
- 1993
- Length
- 28.3 m (92.8 ft)
- Max Span
- 28 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 831
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $795,000
- Total Project Cost
- $1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.