LUCY RD over EAST LOW CANAL 4372+31.0

00.25 MI N SR26 · County 001, Washington · Built 1953 · 2 Lanes · 223 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
086368000000000
Year Built
1953
Reconstructed
1971
Length
23.8 m (78.1 ft)
Max Span
7.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
223
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,588,000
Total Project Cost
$3,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.