SR 26 over EAST LOW CANAL
6.5 E JCT SR 17 · County 001, Washington · Built 1959 · 2 Lanes · 2,260 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.79485, -119.000217
This bridge is in worse condition than 87.7% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
LUCY RD over EAST LOW CANAL 4372+31.0
Built 1953
SR 26 over NP RY
Built 1959
GEARHARDT RD over LATERAL EL85 STA 2+30.30
Built 1952
HATTON RD over EAST LOW CANAL
Built 1953
CUNNINGHAM RD over EAST LOW CANAL 4202+20
Built 1971
MAINTENANCE ROAD over SCOOTENEY WASTEWAY
Built 1953
BOOKER RD over WASTEWAY
Built 1985
YEISLEY RD over BRANCH CANAL - EL 85
Built 2005
BILLINGTON RD over EL81 WASTEWAY 67+12.23
Built 1952
MUSE DRIVE over POTHOLES EAST CANAL
Built 2023
Bridge Details
- Structure #
- 0006047B0000000
- Year Built
- 1959
- Length
- 31.1 m (102 ft)
- Max Span
- 12.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,260
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $969,000
- Total Project Cost
- $1,938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.