BLAIR STREET over S FORK UNION FLAT CREEK
0.10 E SR 195 · County 075, Washington · Built 1990 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.542161, -117.082181
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 36 years old.
Nearby Bridges
UNIONTWN EAST/9410 over UNION FLAT CREEK
Built 1962
APP UTWN EAST/9410 over UNION FLAT CREEK
Built 2001
APP UNIONTN E/9410 over THORN CREEK
Built 1994
UNIONTOWN EAST over THORN CREEK
Built 2011
BAUER/9440 over UNION FLAT CREEK
Built 1971
LEON ROAD over UNION FLAT CREEK
Built 1938
US 195 PRVT APPR over UNION FLAT CREEK
Built 1966
UNIONTWN EAST/9410 over UNION FLAT CREEK
Built 1976
DEPOT STREET over UNION FLAT CREEK
Built 1977
STEPTOE STREET over UNION FLAT CREEK
Built 1910
Bridge Details
- Structure #
- 086057000000000
- Year Built
- 1990
- Length
- 8.7 m (28.5 ft)
- Max Span
- 8.4 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $271,000
- Total Project Cost
- $542,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.