BAUER/9440 over UNION FLAT CREEK
0.14 MI N SR 195 · County 075, Washington · Built 1971 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.561711, -117.104425
This bridge is in worse condition than 54.4% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
US 195 PRVT APPR over UNION FLAT CREEK
Built 1966
DEPOT STREET over UNION FLAT CREEK
Built 1977
STEPTOE STREET over UNION FLAT CREEK
Built 1910
APP UTWN EAST/9410 over UNION FLAT CREEK
Built 2001
UNIONTWN EAST/9410 over UNION FLAT CREEK
Built 1962
BLAIR STREET over S FORK UNION FLAT CREEK
Built 1990
APP UNIONTN E/9410 over THORN CREEK
Built 1994
UNIONTOWN EAST over THORN CREEK
Built 2011
US 195 over UNION FLAT CREEK
Built 1988
UNIONTWN EAST/9410 over UNION FLAT CREEK
Built 1976
Bridge Details
- Structure #
- 084699000000000
- Year Built
- 1971
- Length
- 19.2 m (63 ft)
- Max Span
- 18.6 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,318,000
- Total Project Cost
- $2,635,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.