SB AIRPORT EXPY over S 170TH ST

1 MI S OF SR 518 · County 033, Washington · Built 1972 · 5 Lanes · 45,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
085812000000000
Year Built
1972
Length
45.1 m (148 ft)
Max Span
29.9 m
Width
21.7 m (71.2 ft)
Lanes
5
Daily Traffic
45,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$5,554,000
Total Project Cost
$11,107,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.