MUKILTEO BLVD over EDGEWATER CREEK
0.07 W JCT SHORE AVE · County 061, Washington · Built 1946 · 2 Lanes · 4,883 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.953308, -122.272153
This bridge is in worse condition than 96% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 80 years old.
Nearby Bridges
25TH AVE WEST over POWDER MILL GULCH
Built 1993
MULIKLTEO BLVD over MERRILL & RING CREEK
Built 1931
5TH ST over BOEING RR ACCESS
Built 1969
MUKILTEO BLVD over GLENWOOD CREEK
Built 1979
SR 525 over POSSESSION SOUND
Built 2020
SR 525 over GN RY
Built 1941
20TH AVENUE WEST over RD TO BOEING PARKING LOT
Built 1969
SR 526 over AIRPORT RD
Built 1969
S-E RAMP over SR 526 MAINLINE
Built 1969
SR 526 over HARDESON ROAD
Built 1969
Bridge Details
- Structure #
- 085593000000000
- Year Built
- 1946
- Length
- 108.5 m (356 ft)
- Max Span
- 27.7 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,883
- Material
- Concrete Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,606,000
- Total Project Cost
- $13,213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.