S-E RAMP over SR 526 MAINLINE
2.0 E JCT SR 525 · County 061, Washington · Built 1969 · 2 Lanes · 14,665 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.922528, -122.260689
This bridge is in worse condition than 50.6% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 57 years old.
Nearby Bridges
20TH AVENUE WEST over RD TO BOEING PARKING LOT
Built 1969
SR 526 over AIRPORT RD
Built 1969
SR 526 over HARDESON ROAD
Built 1969
AIRPORT RD over AIRFORCE RD
Built 1967
ACCESS ROAD A over WETLAND
Built 2002
EVERGREEN WAY over SR 526
Built 1969
25TH AVE WEST over POWDER MILL GULCH
Built 1993
SR 526 over E CASINO RD
Built 1969
MUKILTEO BLVD over EDGEWATER CREEK
Built 1946
5TH ST over BOEING RR ACCESS
Built 1969
Bridge Details
- Structure #
- 0008446C0000000
- Year Built
- 1969
- Length
- 75 m (246.1 ft)
- Max Span
- 33.8 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 14,665
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,870,000
- Total Project Cost
- $3,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.