SCHUSTER PKWY over NORTH 30TH & BNRR
2.0 N JCT SR509 · County 053, Washington · Built 1974 · 2 Lanes · 26,559 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.274322, -122.460111
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 52 years old.
Nearby Bridges
NORTH 21ST STREET over BUCKLEY GULCH
Built 1910
S 4TH STREET over DOCK STREET
Built 1987
NORTH PROCTOR over PUGET GULCH N32 TO N 33S
Built 1927
TAC SPUR-STAD WAY over PAC AVE
Built 1974
TAC SPUR-SCHUST SB over SCHUSTER PKWY NB
Built 1974
TAC SPUR-SCHUST SB over SCHUSTER PKWY SB
Built 1974
TAC SPUR-STADIUM N over SCHUSTER PARKWAY
Built 1974
E 11TH ST over CITY WATERWAY CS2749
Built 1911
I-705 RAMP over FLAT TERRAIN
Built 1987
I-705 N-W RAMP over 15TH ST-PLRR I-705
Built 1987
Bridge Details
- Structure #
- 085577000000000
- Year Built
- 1974
- Length
- 237.7 m (779.9 ft)
- Max Span
- 36.6 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 26,559
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,298,000
- Total Project Cost
- $12,597,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.