NORTH 21ST STREET over BUCKLEY GULCH
N 21ST & FIFE · County 053, Washington · Built 1910 · 2 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.267492, -122.47095
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 116 years old.
Nearby Bridges
SCHUSTER PKWY over NORTH 30TH & BNRR
Built 1974
NORTH PROCTOR over PUGET GULCH N32 TO N 33S
Built 1927
S 4TH STREET over DOCK STREET
Built 1987
TAC SPUR-STAD WAY over PAC AVE
Built 1974
TAC SPUR-SCHUST SB over SCHUSTER PKWY NB
Built 1974
TAC SPUR-SCHUST SB over SCHUSTER PKWY SB
Built 1974
TAC SPUR-STADIUM N over SCHUSTER PARKWAY
Built 1974
E 11TH ST over CITY WATERWAY CS2749
Built 1911
I-705 RAMP over FLAT TERRAIN
Built 1987
S 15TH ST over N-N RAMP
Built 1987
Bridge Details
- Structure #
- 085541000000000
- Year Built
- 1910
- Reconstructed
- 1997
- Length
- 54.9 m (180.1 ft)
- Max Span
- 18.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 15,000
- Material
- Concrete Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,430,000
- Total Project Cost
- $6,859,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.