D STREET over SOUTH FORK PALOUSE RIVER
0.04 MI S FRONT ST · County 075, Washington · Built 1975 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.789847, -117.252333
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
PAT OLD/5630 over SOUTH FORK PALOUSE RIVER
Built 1963
BABBIT8450 over SPRING FLAT CREEK
Built 2005
ARMSTRONG/5490 over SOUTH FORK PALOUSE RIVER
Built 1991
SHAWNEE/5250 over SOUTH FORK PALOUSE RIVER
Built 1975
COLLIN/5290 over ROSE CREEK
Built 1999
ALBION-PARVIN/5260 over FOUR MILE CREEK
Built 1975
MCINTOSH/5270 over ROSE CREEK
Built 2000
MCINTOSH/5270 over FOUR MILE CREEK
Built 1974
HOFER/8050 over SPRING FLAT CREEK
Built 2003
PARVIN/5000 over SOUTH FORK PALOUSE RIVER
Built 1992
Bridge Details
- Structure #
- 085229000000000
- Year Built
- 1975
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,986,000
- Total Project Cost
- $3,971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.