PAT OLD/5630 over SOUTH FORK PALOUSE RIVER

0.46 MI S PULLMAN-ALBION · County 075, Washington · Built 1963 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
083085000000000
Year Built
1963
Length
22.3 m (73.2 ft)
Max Span
21.6 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
10
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,025,000
Total Project Cost
$2,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.