3RD STREET over RUNOFF CHANNEL

0.1 MI E S ST · County 001, Washington · Built 1980 · 2 Lanes · 111 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
085170000000000
Year Built
1980
Length
16.2 m (53.1 ft)
Max Span
15.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
111
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,137,000
Total Project Cost
$2,274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.