FAS 1027 over BN RR GOLD ST NORTHUP S

00.0 N JCT. SUMMA S · County 041, Washington · Built 1971 · 2 Lanes · 5,843 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
085089000000000
Year Built
1971
Length
306.9 m (1006.9 ft)
Max Span
22.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,843
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$11,002,000
Total Project Cost
$22,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.