FAS 1027 over BN RR TOWER AVE NORTHUP

00.0 S JCT. CHESTNU · County 041, Washington · Built 1971 · 2 Lanes · 5,740 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
085087000000000
Year Built
1971
Length
265.2 m (870.1 ft)
Max Span
21.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,740
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$7,852,000
Total Project Cost
$15,704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.