COOPER POINT ROAD over PERCIVAL CREEK AND BNRR
0.1 N EVERGREEN DR · County 067, Washington · Built 1986 · 5 Lanes · 24,550 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.028822, -122.926294
This bridge is in worse condition than 61.3% of bridges in County 067. The average bridge in Washington is 0 years old; this one is 40 years old.
Nearby Bridges
US 101 over PERCIVAL CR & BNRR
Built 1995
US 101 over PERCIVAL CR & BNRR
Built 1995
COOPER PT RD over US 101
Built 1976
RW JOHNSON RD over BLACK LAKE DRAIN DITCH
Built 2003
US 101 over BLACK LAKE BLVD
Built 1995
DESCHUTES PARKWAY over PERCIVAL CREEK
Built 1952
US 101 SB over DESCHUTES PARKWAY
Built 1987
US 101 NB over I-5 RAMPS STREET
Built 1990
I-5 over DESCHUTES PARKWAY
Built 1956
E-S RAMP over S-S RAMP
Built 1990
Bridge Details
- Structure #
- 085039000000000
- Year Built
- 1986
- Length
- 147.8 m (484.9 ft)
- Max Span
- 40.5 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 5
- Daily Traffic
- 24,550
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $17,399,000
- Total Project Cost
- $34,798,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.