COOPER PT RD over US 101

5.0 E JCT SR 8 · County 067, Washington · Built 1976 · 5 Lanes · 22,706 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009808A0000000
Year Built
1976
Reconstructed
2000
Length
50.6 m (166 ft)
Max Span
24.1 m
Width
23.9 m (78.4 ft)
Lanes
5
Daily Traffic
22,706
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,642,000
Total Project Cost
$5,283,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.