TUMWATER STREET over THIRD STREET

0.7 W DOWNTOWN · County 009, Washington · Built 1980 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
085033000000000
Year Built
1980
Length
109.7 m (359.9 ft)
Max Span
26.5 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,051,000
Total Project Cost
$4,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.