EDGEWOOD DRIVE over DRY CREEK

01.90 E JCT SR112 · County 009, Washington · Built 1957 · 2 Lanes · 1,748 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
081422000000000
Year Built
1957
Reconstructed
1999
Length
12.2 m (40 ft)
Max Span
5.8 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
1,748
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$902,000
Total Project Cost
$1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.