SR 112 over ELWHA RIVER

37.3 E JCT SR 113 · County 009, Washington · Built 1972 · 2 Lanes · 5,764 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0009090A0000000
Year Built
1972
Length
171.9 m (564 ft)
Max Span
115.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
5,764
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,090,000
Total Project Cost
$10,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.