COUNTY ROAD over ELTOPIA BRANCH CANAL
2.91 JCT R SR-395 · County 021, Washington · Built 1970 · 2 Lanes · 200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.394658, -119.021169
This bridge is in worse condition than 56.4% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 56 years old.
Nearby Bridges
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1955
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
HEADWORKS SERVICE over ESQUATZEL DIVERS CANAL
Built 1957
COUNTY ROAD over ESQUATZEL WASTEWAY
Built 1998
SAGEMOOR PUMP PLNT over ELTOPIA BRANCH CANAL
Built 2002
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ARTERIAL over POTHOLES EAST CANAL
Built 1956
GLADE NORTH over ESQUATZEL CANAL
Built 1964
Bridge Details
- Structure #
- 084783000000000
- Year Built
- 1970
- Length
- 13.1 m (43 ft)
- Max Span
- 6.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $956,000
- Total Project Cost
- $1,913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.