GLADE NORTH over ESQUATZEL CANAL
0.74S JCT R 916 · County 021, Washington · Built 1964 · 2 Lanes · 2,331 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.347622, -119.114381
This bridge is in worse condition than 56.4% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 62 years old.
Nearby Bridges
HEADWORKS SERVICE over ESQUATZEL DIVERS CANAL
Built 1957
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ROAD over ESQUATZEL DIVERSION CANA
Built 1964
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY HIGHWAY over ESQUATZEL CANAL
Built 2019
SAGEMOOR PUMP PLNT over ELTOPIA BRANCH CANAL
Built 2002
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1965
COUNTY ROAD over ELTOPIA BRANCH CANAL
Built 1970
COUNTY ROAD over POTHOLES EAST CANAL
Built 1955
Bridge Details
- Structure #
- 081624000000000
- Year Built
- 1964
- Reconstructed
- 1984
- Length
- 21.3 m (69.9 ft)
- Max Span
- 21.3 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,331
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,444,000
- Total Project Cost
- $2,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.