MOSQUITO LK RD over CANYON CR

00.1 S E CANYON LK. · County 073, Washington · Built 1937 · 2 Lanes · 418 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
084762000000000
Year Built
1937
Reconstructed
1958
Length
24.4 m (80.1 ft)
Max Span
19.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
418
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,624,000
Total Project Cost
$3,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.