MOSQUITO LK RD over PORTER CREEK

10.3 E VALLEY HWY. · County 073, Washington · Built 1936 · 2 Lanes · 162 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
081410000000000
Year Built
1936
Reconstructed
2010
Length
9.4 m (30.8 ft)
Max Span
9.4 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
162
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$740,000
Total Project Cost
$1,480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.