ATHEY RD over POTHOLES EAST CANAL

00.54 MI SW SR17 · County 001, Washington · Built 1998 · 2 Lanes · 260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084747000000000
Year Built
1998
Length
38.7 m (127 ft)
Max Span
38.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
260
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,473,000
Total Project Cost
$4,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.