HATTON RD over EL68 WASTEWAY 608+83.97

02.08 MI E SR17 · County 001, Washington · Built 1952 · 2 Lanes · 166 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
083996000000000
Year Built
1952
Reconstructed
1970
Length
15.8 m (51.8 ft)
Max Span
5.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
166
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,119,000
Total Project Cost
$2,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.