HARVEY SHAW RD over DRY CREEK

03.397 N SR 125 · County 071, Washington · Built 1966 · 2 Lanes · 504 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084648000000000
Year Built
1966
Length
43 m (141.1 ft)
Max Span
36.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
504
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,726,000
Total Project Cost
$5,451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.