SR 125 over SPRING VALLEY BRANCH

7.8 N JCT SR 125 SPUR · County 071, Washington · Built 1955 · 2 Lanes · 429 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0004763A0000000
Year Built
1955
Length
29.6 m (97.1 ft)
Max Span
7.6 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
429
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$691,000
Total Project Cost
$1,382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.