BASELINE WEST over LAT. BLK 73
Baseline .1 East of V NW · County 025, Washington · Built 1987 · 2 Lanes · 650 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.087325, -119.959761
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 39 years old.
Nearby Bridges
V RD SW over IRRIGATION LATERAL
Built 1956
1 RD NW over IRRIGATION LATERAL
Built 1956
Vantage Rd over FRENCHMAN SPRINGS
Built 1931
HILL TOP RD over FRENCHMAN SPRINGS
Built 1931
Vantage Rd over FRENCHMAN SPRINGS
Built 1931
BEVERLY BURKE RD over I-90
Built 1964
BEVERLY BURKE RD over WEST CANAL BLK 77
Built 1987
SR 281 over WEST CANAL
Built 1964
I-90 over SILICA RD
Built 1982
SR 281 over I-90
Built 1964
Bridge Details
- Structure #
- 084485000000000
- Year Built
- 1987
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 650
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $794,000
- Total Project Cost
- $1,588,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.