LATERAL A RD. over USIS CANAL
00.51 N MCDONALD RD · County 077, Washington · Built 1939 · 2 Lanes · 1,805 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.397292, -120.479958
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 87 years old.
Nearby Bridges
LATERAL A RD. over DRAIN
Built 1939
LATERAL B RD. IRR over CANAL
Built 1963
LATERAL A ROAD over IRRIGATION CANAL
Built 1977
LAT C RD. over USIS CANAL
Built 1963
MCDONALD RD. over USIS CANAL
Built 1956
ASHUE RD. over USIS CANAL
Built 1983
LATERAL B RD. IRR over CANAL
Built 1962
LATERAL A RD. over USIS CANAL
Built 1939
BRANCH RD. over USIS CANAL
Built 1962
ASHUE RD. over WAPATO CANAL
Built 1961
Bridge Details
- Structure #
- 084270000000000
- Year Built
- 1939
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,805
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $758,000
- Total Project Cost
- $1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.