LATERAL A RD. over USIS CANAL

00.99 N PROGRESSIVE · County 077, Washington · Built 1939 · 2 Lanes · 3,637 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
082738000000000
Year Built
1939
Length
11.9 m (39 ft)
Max Span
6.1 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
3,637
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$884,000
Total Project Cost
$1,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.