GOVAN ROAD over WILSON CREEK

2.59 SW SR 2 · County 043, Washington · Built 1978 · 2 Lanes · 62 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
083903000000000
Year Built
1978
Length
24.4 m (80.1 ft)
Max Span
24.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
62
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,624,000
Total Project Cost
$3,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.