SR 21 over DRY RUN

32.3 N JCT SR 28 · County 043, Washington · Built 1950 · 2 Lanes · 267 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0003714B0000000
Year Built
1950
Length
15.2 m (49.9 ft)
Max Span
5.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
267
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$332,000
Total Project Cost
$665,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.