PRAIRIE RD over SAMISH RIVER

0.5 W JCT SR 9 · County 057, Washington · Built 1956 · 2 Lanes · 894 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
083422000000000
Year Built
1956
Reconstructed
2012
Length
23.2 m (76.1 ft)
Max Span
7.6 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
894
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,552,000
Total Project Cost
$3,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.